Case study · EPC
Produced water treatment and water injection expansion, Phase I
Steel structure works for the expansion of produced water treatment and water injection facilities, delivered as prime contractor.
The challenge
An operating oil field expanding its water handling capacity needed a contractor able to take engineering, procurement and construction responsibility on a live site.
What we did
- Engineering, procurement and construction of the steel structure works as prime contractor.
- Fabrication and erection of steel structures for the treatment and injection facilities.
- Work delivered within an operating field under the client's HSE requirements.
Result
Part of a relationship with SICIM at West Qurna-2 since 2017, including a 132 kV substation, T-walls, camp electrical works and equipment rental.