Case study · Electrical installation
132 kV gas-insulated substation, installation and commissioning
Installation, testing and commissioning of a 132 kV GIS substation on a lump-sum basis.
The challenge
High-voltage switchgear had to be installed, tested and handed over on a fixed price within an oil field construction programme.
What we did
- Installation of the 132 kV gas-insulated switchgear.
- Testing and commissioning through to handover.
- Delivered on a lump-sum contract.
Result
Completed within 2017 and followed by further work for SICIM at West Qurna-2.