Case study · Electrical installation

132 kV gas-insulated substation, installation and commissioning

Installation, testing and commissioning of a 132 kV GIS substation on a lump-sum basis.

The challenge

High-voltage switchgear had to be installed, tested and handed over on a fixed price within an oil field construction programme.

What we did

  • Installation of the 132 kV gas-insulated switchgear.
  • Testing and commissioning through to handover.
  • Delivered on a lump-sum contract.
Result

Completed within 2017 and followed by further work for SICIM at West Qurna-2.